Kanban Logistics' Plymouth facility is a prime location with 160,000 sq. ft. and is ideally divided with 60,000 sq. ft. of mfg./distribution space and 100,000 sq. ft. of distribution space. This facility also is rail accessible and has a 50,000 sq. ft. pad accessible for expansion.
Size:
160,000 sq. ft. (200' x 800' pre-engineered building; an additional 50,000 sf pad 4' above grade ready for construction)
Acreage:
25 acres
Location:
Moratock Rd, Plymouth, NC
Use:
Distribution, Warehousing, and Light Manufacturing
Zoning:
I-3 (Industrial)
Construction:
Varco-Pruden metal building with CB-3 frames (3 interior columns per frame line). Both endwalls standard post and beam end frame. Wall sheets 26-guage with Varco-Pruden's KXL Kynar 500 finish. All roof and wall areas insulated with 4" VR reinforced blanket insulation.
Floors:
5.5" slab with 3500 psi concrete, 6 mil vapor barrier, rebar, anchor bolts, "soff cut" control joints. Designed for heavy duty forklift traffic. Slab was poured with 3500 mix, treated with Diamond Hard concrete floor hardener/densifier, has dowels in every joint both ways and has a joint pattern of 12'6" x 12'6".
Roof:
24-guage galvalume SSR roof with 20-year material warranty. Roof is raised to a .5 / 12 slope.
Columns:
Spacing: 50' x 25'
Docks/Doors:
14-8'x10' commercial duty sectional overhead doors with full vertical lift and inside lock; 14 - 6/x6/ 45,000 lb. manually operated pit type levelers with steel faced laminated bumpers; 14 sets of 8'x10' dock seals, 40 oz. vinyl with 8" wear shingles. Two 20'x50' 6" concrete ramp.
Ceiling:
24 feet in center; 20 ft. eaves
Environmental Audit:
Phase I completed
Utilities:
Water:
Served by Washington County Water & Sewer District #1; 16" main
Sewer:
Served by Washington County Water & Sewer District #1; 12" force main
Gas:
Served by NC Natural Gas Corporation; 6" steel line along Moratock Road
Power:
Served by Tideland EMC, 400-amp single-phase service
Transportation:
Roads:
Access on Moratock Road. Major Hwys: US 64 (approx 1/4 mile), I-95 approx. 65 miles
Air:
Raleigh-Durham International approx. 1 hr 45 minutes
Rail:
Norfolk Southern Railroad, spur available to site, with 10 rail docks possible at building, 800 linear feet of dock wall at rail side
Miscellaneous:
Kanban also has an additional 540,000 sq. ft. of warehousing space available within 60 miles of this facility.
©2008 KANBAN LOGISTICS